BGC Contracting: |
Burrup Fertiliser Project: |
| |
Interpret and modify drawings to allow
accurate quotation and fabrication.
Fabricate and install 650m of pit
handrailing. |
| |
|
|
Dampier Salt: |
Dry Salt Stacker Upgrades: |
| |
Joint venture with John Holland - RENE
provided workshop fabrication and personnel to carry out
site installation. |
| |
|
|
Hamersley Iron: |
Dolphin & Fender Changes: |
| |
PPT and EII Wharf. This task has been
successfully carried out on a dozen occasions during the
past four years |
| |
|
|
Pilbara Rail Co.: |
Change out Entire Amphelite Sheeting
on PRC Workshop: |
| |
Carried out in 4 stages, incorporating
working with heights. |
| |
|
|
Transfield: |
Fabricate Crane Base & Support Stand: |
| |
Interpret drawings to allow accurate
quotation and fabrication HDT and supply shop
fabrication drawings. |